Monday, September 17, 2007

Outside the house

The balcony is now a lot safer as the balustrade is up. We had to add an extra post in between the existing posts so that the maximum distance between them was 1.5m. This is apparently required for the stainless steel wire which tends to loosen up abit and can become prised apart by adventurous little kids... but the council guy is still not happy with it. He might be happier if we raise the garden bed right around the house so that the drop is less than 1 metre, which I was already planning to do anyway.
The pic below is our back yard... the evapotranspiration area. This area is the required 700square metres but we need to have it filled (raised to the 1 in 20 flood level). This pic was taken after about 27 truck loads of topsoil from a nearby development site.. probably another 200 tonnes needed...

3 comments:

Anonymous said...

Wow... hard work......
I heard you talked to my nanny the other day. I was going to call you but then forgot.

Assumed you must have been in the neighbourhood.

Take care
Mary

Anonymous said...

what is evapotranspiration area anyway?

Mary

Central Coast Sustainable Eco Home said...

Evapotranspiration area is the area where we lay the underground irrigation system which comes from the biolytix septic tank. The water is pretty damn clean, but laws prohibit its use above ground so we will be using it to constantly water all the fruit trees.