I promise to put up a few photos as soon as I can get home whilst still light!!!
The solar panels are up but the mezzanine for the batteries still have to go up. The trenches for the power and phone have been dug. The biolytix septic tank is in but there's another council hiccup with the evapotranspiration area and I'm about to building the retaining wall all the way around the house so that the balcony has a garden bed surrounding it... its the only way we can use stainless steel wire for the balustrade. photos soon!