
Tuesday, November 6, 2007
Walk Against Warming

Friday, November 2, 2007
Painting Nearly Complete!
Nettie
Saturday, October 20, 2007
Biotop Swimming-Teich / Natural Pool Release 4
This is one example of the kind of natural swimming pool that we plan to build. I'm just starting to plan the layout now.
Wednesday, October 17, 2007
Letter Box!
I cut out the opening in a rather large tree stump with a chainsaw and chisel and hammer then fitted the steel letter box inside.

Monday, October 15, 2007
Solar Power Rebate Approved!
Sorry about the lack of updates the previous couple of weeks. Workwise we've been getting steadily busier and a couple of weddings to attend to have stalled our house progress somewhat... still, we're now about 2/3 of the way through the painting of the walls and ceilings.
The next 4 weeks should see a lot more progress because I just got told that our application for the remote solar power grant has been approved.. I think we're only the 3rd apllication to be approved under this new grant.
SO, that means that we'll get the full solar system in 4~5 weeks which will cost around $62K but the government will fund $31K of that. hurray!
This weekend we're off to Thredbo for Annette' friend Alison's wedding, so I'm looking forward to that.. I've had a super-busy weekend and a couple of late night, stressful 'DPI Community Information meetings' that I spoke at so I'm very much hanging out for that motel shower and a good unwind!
cya
Tuesday, October 2, 2007
Carport Warming!
It was the easiest BBQ ever for me because mum brought up everything.... and it was all very yummy!
This is my grandad Yozo Asakura. He's looking very sprightly for his 90 years!
A building site isn't all that kid friendly, but I spent all weekend tidying up and I was very happy to avoid any incidents with the girls... just a couple of dislocated elbows :-)
Friday, September 28, 2007
A New Home for Our Caravan!
On the house front, we are still plodding along with the painting though it seems like it will never end. We've finished undercoating, the laundry is painted (other than the trims) and 2 ceilings are complete...still plenty more to go. Painting ceilings is not much fun! However, the Dulux EnvirO2 and Aquanamel paints make things much more pleasant as they are relatively odourless and easy to apply. Our ensuite and laundry are now tiled (we will post photos later) and the showerscreen is in. We are waiting on a new toilet from Caroma (see below) called the 'Profile Suite', which should be available in October. It has a hand-washing basin built-in on top of the cistern and uses the hand-washing water to fill the cistern, so the water is effectively used twice (go to http://www.caroma.com.au/ for more info). It costs around $500 and will be available from stores such as Bunnings. sooj says ... "my grandma and grandad have had these for 25 years in their unit in Tokyo... its about time Oz caught up..."
We are quite enjoying actually living on our property now (even though we're in a little caravan) as there's plenty of space and it's quite pleasant pottering around in the morning with lots of different birds going about their morning routines. Sooj recently discovered some Eastern rosellas nesting in a tree hollow and I've been enjoying bird-watching in my own backyard. Apparently (according to the ecological assessment guys who did the initial eco reports on this property about 5yrs ago), there is a large population of ringtail possums here, and there are also antechinus; some koalas were also seen when they did the original assessment. I plan to go spot-lighting soon to have a look for myself!
Must go and have dinner which Sooj has cooked on the barbie. Have a look at the pics below.
Bye for now,
Nettie
The carport provides a perfect shelter for our caravan (no more leaks) and fits both cars as well. When the shed is built, it will be connected to the carport on the side which is furthest to the right on this photo (northern aspect). The solar panels will sit on the north-facing side of the carport roof.
We have a nice little set-up outside the caravan, with gas barbecue (sitting alongside the outer caravan wall) and tables and chairs. There will be no more issues with mud when it rains as the floor of the carport is crushed recycled concrete.
Sally-Ann doing her book/computer work for Wyong Equine Clinic, just outside the caravan.
The new Caroma Profile Suite...see http://www.caroma.com.au/ for details.
Wednesday, September 26, 2007
Carport construction
Last week the carport construction was begun and Charlie finished the job this Tuesday!
Its a pretty gigantic 'carport' and it will support all 50 solar panels.
These past 2 weeks, Sally Anne has been coming to work at my place... and doing lots of washing because we need to wear fresh overalls at every call. The number of infected properties is steadily increasing so we are pretty busy all day long... the phone is driving us mad!
This is the view from the top of the scissor lift which was hired to build the carport.Next time I'll put up photos of our new arrangement with the caravan safely underneath our new carport... hopefully no more leaks!... and just in time too because I can hear some heavy rain on the roof! The roof has also been connected to another 22000 litre tank so we now have 66000 litres of rain water capacity.
cya!
Monday, September 17, 2007
Outside the house
The balcony is now a lot safer as the balustrade is up. We had to add an extra post in between the existing posts so that the maximum distance between them was 1.5m. This is apparently required for the stainless steel wire which tends to loosen up abit and can become prised apart by adventurous little kids... but the council guy is still not happy with it. He might be happier if we raise the garden bed right around the house so that the drop is less than 1 metre, which I was already planning to do anyway.
The pic below is our back yard... the evapotranspiration area. This area is the required 700square metres but we need to have it filled (raised to the 1 in 20 flood level). This pic was taken after about 27 truck loads of topsoil from a nearby development site.. probably another 200 tonnes needed...
Update at last!
We're about 3/4 through the first (of 3) coats of paint and filling in gaps around architraves and bumps in the walls etc. I think the preparation bit takes the longest and once this undercoat is done, the final two coats should be quicker. We are using Dulux EnvirO2 for the walls and ceilings and Aquanamel for the trims. These are low Volatile Organic Compound paints and are also carbon offset during production. The Aquanamel is a water based enamel.
Our laundry arrangement. We plug up the washig machine and the water pump to the generator and we have a couple of usable taps outside for the water. The detergent we are using is the AWARE powder which you can get at supermarkets. Its quite environmentally friendly.
The cats have been living these past 2 weeks in our guest bedroom. Its much bigger than the cage at boarding but they're a bit scared with the noise from building activities and the smells!
Nettie sanding away. Sarah (her sister) also came over a couple of weeks ago and gave us a hand with the wall sanding.
A view from the front door. The raised bed behind my car (white 4WD) is the site for the carport which is being delivered tomorrow. Charlie Britt (a horse trainer friend) is putting it up for us. The carport is 9m wide and 12m deep and its roof will be pitched at 30 degrees so we'll use its northern roof section as the site for the 50 solar panels.
Saturday, September 1, 2007
What a week!
The only hiccup at this stage is that the fridge is not working as it should. Its a 3-way fridge and we want it to be on gas the whole time but the gas is not working, so everything that we brought from our old house had to be thrown out :-( We'll try and fix the situation this week.)...actually it was at least added to the compost so won't be totally wasted ;) (Nettie)
Our caravan is quite spacious with a double bed, a full kitchen and a separate bathroom with a shower, vanity and a toilet. We are emptying the toilet canister into the porta-loo which we have had here on-site for the last 3 months for the tradesmen. But generally, number ones are in the bush and we try to use others (eg shoping centres) for number twos!! :-P
The water from the kitchen and bathroom sinks and the shower water is piped outside, where I've placed a bucket to collect is and we are using it to water the pot plants.
This is my car as discussed before. The battery is in a case (on the right) and the 1000W inverter (red box) is easily accessible from the side windows of my canopy in the car. The system is working out really well. Its powering everything is the van except the freezer which had to be disconnected because of the huge load the compressor draws when it is first starting up.
Oh yeh, this week has been quite stressful, with the house moving, caravan setting up, house building and now the Equine Influenza outbreak!!! At this stage we are quietly confident that we will get on top of things here and life can go back to usual. I hope I don't have to look this riduculous for much longer....
On the house front: the fixing out is complete and so now we have to roll up our sleeves and start painting! Outside the house this week we will HOPEFULLY get the shed and carport site excavated and the piers for the carport formed and the evapotranspiration area for the septic system can be prepared. Due to Council headaches, we now have to bring in about 200 cubic metres of good quality topsoil to create 700square metres of septic irrigation area ABOVE the 1 in 20year flood level! We're getting quite used to budget blow outs and unexpected costs.... We will also pay the deposit for the 50 panel solar system this week and get the application in for the government rebate, once that is done, it should be only about 7 weeks before we have power to the house!
cya
Thursday, August 23, 2007
Semi-sustainable caravan life.
As we have will not have our solar power for another 2 months ( at least) and the caravan can only be powered by 240 volt cable, we were faced with the prospect of having to run a generator every night for a couple of months to power the water pump (shower/toilet/sink), the laptop for internet access, charge the mobile phones etc etc. Even if I re-wired the van and set up a battery, the battery would have had to be charged for a few hours each day to use each night.... not only is the generator noisy, it seemed like unnecessary carbon emissions.
So, I've done what I'd always wanted to do for work... carry my own power source for Xrays, Ultrasounds etc just in case the power was unavailable at the horse. We've been meaning to do it for years, but this seemed the right excuse... I've installed a large 90amp 12V second battery into the work car with a 1000W inverter which will convert the 12V into 240V. The batteries will be wired so that as I drive around all day for work, both batteries will get charged. When I get home, I can plug the caravan directly up to the inverter in the back of the car. Although the battery won't stay charged for very long if a lot of appliances are used, if we are conservative, it should last each night and be useful for the laptop, phones, light and water. This way we will only use the generator occasionally for tools, vacuum cleaner etc. The first battery in the car will be protected so that it won't be used for the inverter and eliminate the risk of having a car with a flat battery in the morning! This option definitely eases my conscience when it comes to the amount of driving I do each day (~250km).
The Protector 1000W inverter cost about $420 and the lead acid battery was $187 (a gel battery or a fully sealed one is around $330). Add another couple hundred for the battery case and wiring by the autoelectrician. Will report on how it works next time!
Thursday, August 16, 2007
Plastering Finished and Making Arrangements to Move onto Property.
This is our new arrangement: The shipping container for us to move ALL our gear into this week. And the caravan on the right which we will call home for the next 2 months (no more I hope!).
Nettie starting to move things from our old house into the container.
The plasterers finished off the walls and cornices today. We will start fixing out (thats architraves, door jambs, doors etc) and the balcony balustrades tomorrow!!
The living room...
We've bought a few bits of furniture from the Central Coast Tender Centre, which is like a gigantic garage sale where you bid on items like in a silent auction. They have some great second hand stuff and we also bought these timber slabs from there this week. These slabs will be used in the house and laundry. The narrow ones are Camphor Laurel (which is an invasive, undesirable, introduced tree) and the laundry bench will be made with the silky oak slab (we like silky oak because we already have some antique furniture which is made from them) from a private local property. Tuesday, August 14, 2007
An update from Nettie
We have bought a caravan (complete with toilet, shower, oven/stove, microwave, fridge and freezer!) which we'll be living in on-site once we move out of our home at Berkeley Vale (by the 28th August...not long to go). This is going to be interesting but we can just pretend we are camping and I think we'll be fine.
The plasterers are doing their bit this week; they started last Friday and should be finished by Thursday. Then we can start the fit-out (or Bernie the builder can) and think about starting some painting...yes we have decided to do it ourselves, since I'm working part-time and we have the time to do it as the main constraint on moving in to the house is the power, which will take a while to complete. I've been looking into some paint options, including the various biopaints (non-toxic plant-based paints). I think we will probably end up using the new semi-enviro-friendly (ie, compared to regular paints that are available) Dulux paints (EnvirO2 and Aquanamel) rather than biopaints due to the big difference in price-tag. The new Dulux paints are low-VOC (volatile organic compounds that will contribute to air-pollution in the home), have reduced solvent emissions and are 100% greenhouse gas abated through the AGO greenhouse friendly programme. The Aquanamel is more enviro-friendly than regular enamel paint as it is water-based rather than oil(petrochemical)-based. Anyway, I'm still looking into paint options so might even change my mind on this one.
We are looking at about 8-9weeks before our remote-area solar power system will be ready. The panels (I think around 60 or so) will be placed on the roof or our carport (which is yet to be built) and the plan is to put the large battery system on a mezzanine in the carport (so will be well above the required flood zone level). The other essential which seems to be taking forever to sort-out, is the waste water treatment system (Biolytix) which hopefully will be in before the power. We just need to prepare the treated water dispersal area by clearing some scrub and levelling it with good quality soil (this is an area of 690m2 by the way, which is quite massive). Anyway, the dispersal area is going to be the site for many fruit trees (which should thrive with the high nutrient water) so at least the site will be semi-prepared for planting.
We have hired a 20ft shipping container to store everything from our house, on-site, until our new home is ready. I'm not looking forward to the whole moving process but it will be nice to be able to say goodbye to our old house and not have to worry about looking after it anymore.
Until next time,
Nettie
Sunday, August 12, 2007
Gutter guards


Saturday, August 11, 2007
Owner Builder in Action!



Wednesday, August 1, 2007
We're back!!
After 16 days away, followed by a week in court on jury duty, I'm back! We've just finished off the internal walls and next week, the plasterers will be in to finish off the ceiling and the walls. We have sold our Berkely Vale house and have just 4 weeks until we have to move in! We are probably going to hire a caravan to put on site because the power is almost certainly not going to be up by then..... maybe by the end of September...
I will take some photos soon and post some up. cheers
Tuesday, July 3, 2007
We're off to the UK for a couple of weeks!
Since we are off to the UK and Sweden for a couple of weeks, there won't be too much more progress for a few weeks, but at this stage, the plumbing is complete, the electricals are ready and the walls just about done. So when we come back we should be able to quickly finish of hte walls and ceiling and then we can get to the architraves, balaustrades, floor etc whilst we get the Biolytix septic system connected and the power (solar) installed.... getting there!
Monday, June 25, 2007
Weekly Update
Have begun putting up the walls today. The Powerscape boards arrived last Friday. They are so heavy!! And they are a bit harder than normal plasterboard to put up.... BUT, they seem to be a great product and I'm very happy to be using them. Follow our link below for POWERSCAPE. We are installing the Powerscape Confidence Ultra-mesh. Its been used in luxury homes, gymnasiums, schools and high density buildings because of their acoustic and fire ratings and most importantly their durability. We also like the fact that its made of 95% recycled material. The plumbing is almost finished. Annette spent a very tough weekend using a jack-hammer to remove the old laundry slate floor o that we can continue work on the new ensuite. All the grey water has been separated out from the black-water so that we can install a grey water system... we are still trying to decide what type of system to use.. just a system for using the water on the garden OR a proper treatment system for reuse inside the house.... hmmmm
cya
Wednesday, June 20, 2007
Insulation
The recommended insulation for our climate is R1.5~R2.0 fibreglass batts for the walls and R2~R3.0 for the ceiling.
We've put in R2.0 Bradford Gold Wall batts from CSR (these are basically the same as the Boral Pink Batts) into the external walls and will use Boral R3.0 Pink Polybatts in the ceiling. The poly wool batts aren't quite as eco friendly as the fibreglass ones which are up to 70% recycled glass content, but they are a lot nicer to handle (not itchy and irritating), and since I'll probably be in the roof from time to time, I prefer the polybatts. These types of insulation generally work out at between $3.20 and $5.50 per square metre. Our ceiling and external wall areas are about 300 square metres.
We aren't putting in extra sound insulation batts because we are using a really good wall product. The gypsum-type wall is called POWERSCAPE and it is thicker than the usual plasterboard, denser and more compressed and is therefore stronger and more sound proof. Unlike normal plasterboard, you can fix screws into it and it'll hold up to 20kg. It has the impact resistance of masonry, so it will last much longer, it is low allergenic and just as easy as plasterboard to install. Even though it has a higher embodied energy compared to Australian made plasterboard - probably from the transport cost (therefore, not as good ecologically), it is actually certified to be composed of 95%recycled material, which is much better than the plasterboard. So, yes, this wall is more expensive (normally about 4 times more expensive than plasterboard) but the Australian distribution of Powerscape is changing hands as of the 1st July, and they are going to discontinue the 16mm product and only sell 13mm boards so I've been able to buy 400 square metres at $8.50 +GST per metre instead of ~$18 +GST.
Anway, our next week will involve getting termite treatment, putting up the powerscape and finishing the ceiling insulation and plasterboard. Then, whilst we are in Sweden for Tomo's wedding, we 'll get the plasterer to finish off and maybe even get in a painter!
cya
Instead of putting
Sunday, June 17, 2007
Weekly update!
Over the last couple of weeks, we've been busy sourcing lighting, researching tiles, choosing flooring, bathroom and laundry fittings etc. We are using downlights throughout the house. The downlights are all on GU10 240V fittings. This means they can take new energy saving down lights which draw only about 11W and are nearly as bright as the halogen bulbs. Unlike all the 12Volt systems they don't need a transformer either. Transformers use up 10~15W on top of the energy for the light bulb (usually 50W halogen). A 12V system can take the new low energy 12Volt LED lights, unfortunately they just aren't bright enough compared to the CFL (compact fluorescent) or the halogen. We are however going to use a few 3W LED GU10 downlights (callled LUXEON) as well. These aren't that bright, but at only 3W energy consumption (plus no transformer) they are a must!
On the energy front, we have had a few develpments. It looks like its going to cost~$25000 for us to get connected to the grid! So we said bugger it. We are going to go full solar on a stand alone system.... ie batteries, no grid connection etc. Normally, a system to cater for a family would cost around $58000. The current NSW government rebate is only $8000, so we were a bit hesitant at first... but wait! There's more...
From July 1 this year, there will be a new rebate scheme in NSW that was previously only available in WA and other very remote areas. Under the new funding, IF it is going to cost $30000 (or there abouts) to get connected to the grid, the government will subsidise 50% of the costs of installing a stand alone solar system so that you don't have to get connected. The only down side is that we wouldn't be allowed to connect to the grid for at least 5 years if we want to keep the rebate.... but after the last weekends events and power outages.. and the predicted future power problems as the population and demand on the grid increases, we don't think we'll be plugging-in in a hurry!
So the bad news is that we'll still be spending close to $30000 for power, but the GREAT news is that it will be all solar and wind (plus back up generator.. just in case) and we'll never pay another cent to energy australia. The only down side for us is that the new scheme is not in place yet and it may be August before we get set up..... please send us all your used/unwanted candle wax for us to recycle!
cya
Sunday, June 10, 2007
Flood Photos
View from the freeway.. our house is around where the arrow is.The road leading to the driveway (arrow). It got to around 1m deep - just a tad too deep for my car.

The people opposite us weren't so lucky. They had a tree and power lines down over their driveway so they left the cars on the driveway overnight whilst waiting for emergency services. The next morning.... all three cars are ruined.

The view of the next door neighbours property shows the water coming up well...

But the water was also rising up in the bushes all around the house. This view is to the east side of the house... the water was about 50cm above the base of the water tanks (I hope all the substrate below the tanks didn't get washed away!!)
Water, water and more water!!
We've just been reconnected to the cyberworld because we've just gotten power back after about 60 hours. If you haven't seen the news, there's been a lot of rain on the east coast of New South Wales and there's floods galore! Maitland are in real trouble and the water is expected to peak there tonight. Most of the rain on the Central Coast was over the last 3 days and have now just about stopped. The death toll is at 9 and there are still 110000 homes without power.
Our new home was relatively unscathed. Its just that the road in front of the property flooded and we still can't access the house by car. We can however still get to the house via the neighbour's property. I took some photos on Saturday morning, but the water rose quite a bit more after that.
Anyway, last week, most of the carpentry was finished and the electricians have started work. they were going to be finished by the end of this week (but that may now be a bit delayed) and we were going to put up the walls on Monday week.... fingers crossed.
On the work front, lots of horses have been hurt in the floods but as far as I know, I haven't heard yet of too many losses (but I'll be on call tomorrow and expect a busy day).
I'll post a few photos of the floods next.
Pete
Sunday, June 3, 2007
Internal works begun!!
Last Monday, much to our pleasant surprise, the DA for the alterations was approved (we had been told 8weeks, but it was only 3! bonus!) and so we began internal works. Originally, we had been looking at another builder, but when they failed to give me a quote/estimate after 5 weeks, I thought.. here we go, someone else who'll put us on the back burner... so I've enlisted Bernie Maloney, our trusty old guy.. he did our reno's at Berkeley Vale for us and is very accomodating and good. So these firt pics are from the kitchen area looking to the (future) living room. It was filled up by the third bedroom and made no use of the best (northern) areas of the house. So its coming down. Last Thursday, Berney started demolishing and (with my help) he is now already ready for putting up the new wall for the main bedroom and the laundry... except that the wall isn't exactly new. I wanted to recycle every bit of timber from the house, so we are building all the new stuff with the old... I've just been spending a lot of time over the weekend pulling out nails from the old hardwood... very tough job... Because of the labour involved and the increased difficulty of putting it back up, its more costly in labour, but we can save a little bit on not buying the new timber (which is pretty cheap ~$1.2 p/m for structural pine). I've stayed in the house overnight in my swag.. it was just like camping!
Sunday, May 27, 2007
Soil condition and preparation

Here are some of the stumps post-removal.

Last Friday I started the massive task of soil improvement on the property. The soil is silty clay and moderately acidic - my pH measurements ranged from 4.5 to 5.5. A low pH impedes the ability of plants to take up nutrients and so does the clay nature of the soil. Most fruit and vegie plants will be more productive with a slightly acidic soil (around pH 6.5). To help break up the clay I've added gypsum (I started with a rate of 0.5-1kg/m2, which I partly based on the geotechnical report recommendations and also from books) and to increase the pH I've used dolomitic limestone (roughly 0.2kg/m2 - this is probably a bit less than what's needed but I'll add more later if necessary). I had my first experience of driving a tractor and discovered that using the bucket (to transfer loads of soil etc) is actually quite difficult to coordinate (for me at least). It was quite hard to get a decent load size. We also really need to add lots of organic matter to the soil, which I've started in the form of some well-aged horse manure (combined with stable sawdust bedding) from a nearby horse stud. We need lots more organic material which is difficult as it's expensive (well compost is to buy and it takes time to make). We have started a compost heap but this will be a slowish process. However I also plan to plant a green manure crop which will help to improve the soil structure as well as adding nitrogen to the soil and helping to suppress the growth of weeds. I have some perennial ryegrass, oats and also various legume seeds (chickpea, lentils etc) which will be planted directly into the soil as a mix. I'm just waiting on some rain (or the forecast of rain) so the seeds will have a chance to germinate!