POWER - The main thing pre-christmas was the power being put on... hurray!!! So, Clint the sparky worked har the week before Xmas and got it all going. The guys from Solar Shop were great and they got the power system up and going in one day. The system is on a supa-mezzaine in the carport that Charlie put up they day before the solar guys arrived. After a few sunny days, the batteries have been pretty much >90% most of the time. All the power points work as well as the lights so now we can work into the night.... yeh...
The Solar Shop guys with the power going for the first time!!!
SEPTIC - this isn't quite finished, but Chris the Biolytix guy came out on Thursday just after Christmas and put in most of the sub-surface irrigation so that we could use the shower, bath and toilet etc..... but the major hicup came before that when the Totally Green Plumbers were slack as. Even though they could have put in the hot water tank and installed all the taps and stuff back in August (we bought the stuff in June but the walls weren't up until August) Mitchell the guy thats been doing our stuff kept saying that they wanted to do everything in one go when the septic and power were both available so that they could commission it straight away... anyway, he kept putting us off until the Friday before Christmas, came at 9:30 and left at 2:30 after only getting the hot water tank in and the taps on the bath tub, then said he'd be back on the 7th January!!! (which by the way has come and gone and he hasn't called us)... I was very pissed off because we still had no toilet and no water in the house except out of the bath taps. Anyway, Nat (husband of Nicole who works at Wyong Equine Clinic) came to the rescue and a couple of days later on the Sunday before Chrissy, came over and put in the toilet cistern and basin taps and fixed the water pump... he'd only accept a bottle of wine!! I also fixed the ensuite shower and the kitchen taps so we were now right to go and move into the house after the septic irrigation lines were in. So, the Friday the 28th December, we unofficially moved in... our mattress from the caravan into the guest bedroom and slept in our new house and used the toilet!
Having a late night Hungry Jack's for our moving-in celebration dinner with some champers!!
FLOOR - We sanded back and varnished the 2nd and 3rd bedroom floors the weekend before Christmas and also moved all the bamboo flooring that was delivered into the house to acclimatise, then for the following 1.5 weeks after Christmas, Bernie has been back in action and we've been doing the floors together. The bamboo boards look really good and feel good as well, but the job was quite back-breaking work. Tomoko and Viktor were at least able to visit us a couple of times. Last weekend, they stayed over night after our first 'official' dinner. We also had Michael and Kristy over for our mini house warming. Thanks for the Frangipani! The next morning, even though Annette told Tomo and Vik to 'sleep in as long as you like', we were banging and sawing and being very noisy from 7:30am onwards so they didn't get much of a sleep in... then they helped us rub off the glue marks and finger prints off the new floor with metho!!! Thanks guys. The bamboo flooring has now been finished!
The timber slabs on teh counter...
THIS WEEK - Charlie came back yesterday and finished off hte mezzanine in the carport with a gate and ballustrade so its now all safe and we'll take photos for the solar shop guys to be able to claim the government rebate. Annette has been busily painting the skirting boards before they get put into position later in the week. We also picked up our new toilet for the ensuite.. the Caroma Profile Suite with the handbasin on top!! Itwas a couple hundred dollars more than I was expecting ($870), but since we've been waiting for it since September, I'm not complaining :-)
Now the dilemma.... do we let the plumbers that let us down back into the house and touch our special can (toilet)?
Will put on more photos later..
cya
Pete
Monday, December 10, 2007
Solar panels

A grid was installed first and the panels were fixed to these. The guys spent most of the day installing the panels.

The panels look quite good on the carport roof. They are in a prime position (facing north) to collect the sun's energy.Monday, November 26, 2007
Progress
The solar panels are up but the mezzanine for the batteries still have to go up. The trenches for the power and phone have been dug. The biolytix septic tank is in but there's another council hiccup with the evapotranspiration area and I'm about to building the retaining wall all the way around the house so that the balcony has a garden bed surrounding it... its the only way we can use stainless steel wire for the balustrade. photos soon!
Monday, November 19, 2007
Progress (or lack of) Report


Sunday, November 11, 2007
Walk Against Warming

Please take a look at the pics. Sarah and I had fun and I'll definitely be turning up for next year's walk too!
Young boy urges people to take action, for the sake of his, and future, generations.
Greens Senator Bob Brown
Peter Garret was so enthusiastic he almost broke into a dance.

Nettie with placard...pretty appropriate since we're fighting the Korean coal mine project on the Central Coast and Sooj and I are about to get our solar panels so we won't be relying on the horrible stuff.
Turning out of Macquarie St, to walk around Hyde Park.Tuesday, November 6, 2007
Walk Against Warming

Friday, November 2, 2007
Painting Nearly Complete!
Nettie
Saturday, October 20, 2007
Biotop Swimming-Teich / Natural Pool Release 4
This is one example of the kind of natural swimming pool that we plan to build. I'm just starting to plan the layout now.
Wednesday, October 17, 2007
Letter Box!
I cut out the opening in a rather large tree stump with a chainsaw and chisel and hammer then fitted the steel letter box inside.

Monday, October 15, 2007
Solar Power Rebate Approved!
Sorry about the lack of updates the previous couple of weeks. Workwise we've been getting steadily busier and a couple of weddings to attend to have stalled our house progress somewhat... still, we're now about 2/3 of the way through the painting of the walls and ceilings.
The next 4 weeks should see a lot more progress because I just got told that our application for the remote solar power grant has been approved.. I think we're only the 3rd apllication to be approved under this new grant.
SO, that means that we'll get the full solar system in 4~5 weeks which will cost around $62K but the government will fund $31K of that. hurray!
This weekend we're off to Thredbo for Annette' friend Alison's wedding, so I'm looking forward to that.. I've had a super-busy weekend and a couple of late night, stressful 'DPI Community Information meetings' that I spoke at so I'm very much hanging out for that motel shower and a good unwind!
cya
Tuesday, October 2, 2007
Carport Warming!
It was the easiest BBQ ever for me because mum brought up everything.... and it was all very yummy!
This is my grandad Yozo Asakura. He's looking very sprightly for his 90 years!
A building site isn't all that kid friendly, but I spent all weekend tidying up and I was very happy to avoid any incidents with the girls... just a couple of dislocated elbows :-)
Friday, September 28, 2007
A New Home for Our Caravan!
On the house front, we are still plodding along with the painting though it seems like it will never end. We've finished undercoating, the laundry is painted (other than the trims) and 2 ceilings are complete...still plenty more to go. Painting ceilings is not much fun! However, the Dulux EnvirO2 and Aquanamel paints make things much more pleasant as they are relatively odourless and easy to apply. Our ensuite and laundry are now tiled (we will post photos later) and the showerscreen is in. We are waiting on a new toilet from Caroma (see below) called the 'Profile Suite', which should be available in October. It has a hand-washing basin built-in on top of the cistern and uses the hand-washing water to fill the cistern, so the water is effectively used twice (go to http://www.caroma.com.au/ for more info). It costs around $500 and will be available from stores such as Bunnings. sooj says ... "my grandma and grandad have had these for 25 years in their unit in Tokyo... its about time Oz caught up..."
We are quite enjoying actually living on our property now (even though we're in a little caravan) as there's plenty of space and it's quite pleasant pottering around in the morning with lots of different birds going about their morning routines. Sooj recently discovered some Eastern rosellas nesting in a tree hollow and I've been enjoying bird-watching in my own backyard. Apparently (according to the ecological assessment guys who did the initial eco reports on this property about 5yrs ago), there is a large population of ringtail possums here, and there are also antechinus; some koalas were also seen when they did the original assessment. I plan to go spot-lighting soon to have a look for myself!
Must go and have dinner which Sooj has cooked on the barbie. Have a look at the pics below.
Bye for now,
Nettie
The carport provides a perfect shelter for our caravan (no more leaks) and fits both cars as well. When the shed is built, it will be connected to the carport on the side which is furthest to the right on this photo (northern aspect). The solar panels will sit on the north-facing side of the carport roof.
We have a nice little set-up outside the caravan, with gas barbecue (sitting alongside the outer caravan wall) and tables and chairs. There will be no more issues with mud when it rains as the floor of the carport is crushed recycled concrete.
Sally-Ann doing her book/computer work for Wyong Equine Clinic, just outside the caravan.
The new Caroma Profile Suite...see http://www.caroma.com.au/ for details.
Wednesday, September 26, 2007
Carport construction
Last week the carport construction was begun and Charlie finished the job this Tuesday!
Its a pretty gigantic 'carport' and it will support all 50 solar panels.
These past 2 weeks, Sally Anne has been coming to work at my place... and doing lots of washing because we need to wear fresh overalls at every call. The number of infected properties is steadily increasing so we are pretty busy all day long... the phone is driving us mad!
This is the view from the top of the scissor lift which was hired to build the carport.Next time I'll put up photos of our new arrangement with the caravan safely underneath our new carport... hopefully no more leaks!... and just in time too because I can hear some heavy rain on the roof! The roof has also been connected to another 22000 litre tank so we now have 66000 litres of rain water capacity.
cya!
Monday, September 17, 2007
Outside the house
The balcony is now a lot safer as the balustrade is up. We had to add an extra post in between the existing posts so that the maximum distance between them was 1.5m. This is apparently required for the stainless steel wire which tends to loosen up abit and can become prised apart by adventurous little kids... but the council guy is still not happy with it. He might be happier if we raise the garden bed right around the house so that the drop is less than 1 metre, which I was already planning to do anyway.
The pic below is our back yard... the evapotranspiration area. This area is the required 700square metres but we need to have it filled (raised to the 1 in 20 flood level). This pic was taken after about 27 truck loads of topsoil from a nearby development site.. probably another 200 tonnes needed...
Update at last!
We're about 3/4 through the first (of 3) coats of paint and filling in gaps around architraves and bumps in the walls etc. I think the preparation bit takes the longest and once this undercoat is done, the final two coats should be quicker. We are using Dulux EnvirO2 for the walls and ceilings and Aquanamel for the trims. These are low Volatile Organic Compound paints and are also carbon offset during production. The Aquanamel is a water based enamel.
Our laundry arrangement. We plug up the washig machine and the water pump to the generator and we have a couple of usable taps outside for the water. The detergent we are using is the AWARE powder which you can get at supermarkets. Its quite environmentally friendly.
The cats have been living these past 2 weeks in our guest bedroom. Its much bigger than the cage at boarding but they're a bit scared with the noise from building activities and the smells!
Nettie sanding away. Sarah (her sister) also came over a couple of weeks ago and gave us a hand with the wall sanding.
A view from the front door. The raised bed behind my car (white 4WD) is the site for the carport which is being delivered tomorrow. Charlie Britt (a horse trainer friend) is putting it up for us. The carport is 9m wide and 12m deep and its roof will be pitched at 30 degrees so we'll use its northern roof section as the site for the 50 solar panels.
Saturday, September 1, 2007
What a week!
The only hiccup at this stage is that the fridge is not working as it should. Its a 3-way fridge and we want it to be on gas the whole time but the gas is not working, so everything that we brought from our old house had to be thrown out :-( We'll try and fix the situation this week.)...actually it was at least added to the compost so won't be totally wasted ;) (Nettie)
Our caravan is quite spacious with a double bed, a full kitchen and a separate bathroom with a shower, vanity and a toilet. We are emptying the toilet canister into the porta-loo which we have had here on-site for the last 3 months for the tradesmen. But generally, number ones are in the bush and we try to use others (eg shoping centres) for number twos!! :-P
The water from the kitchen and bathroom sinks and the shower water is piped outside, where I've placed a bucket to collect is and we are using it to water the pot plants.
This is my car as discussed before. The battery is in a case (on the right) and the 1000W inverter (red box) is easily accessible from the side windows of my canopy in the car. The system is working out really well. Its powering everything is the van except the freezer which had to be disconnected because of the huge load the compressor draws when it is first starting up.
Oh yeh, this week has been quite stressful, with the house moving, caravan setting up, house building and now the Equine Influenza outbreak!!! At this stage we are quietly confident that we will get on top of things here and life can go back to usual. I hope I don't have to look this riduculous for much longer....
On the house front: the fixing out is complete and so now we have to roll up our sleeves and start painting! Outside the house this week we will HOPEFULLY get the shed and carport site excavated and the piers for the carport formed and the evapotranspiration area for the septic system can be prepared. Due to Council headaches, we now have to bring in about 200 cubic metres of good quality topsoil to create 700square metres of septic irrigation area ABOVE the 1 in 20year flood level! We're getting quite used to budget blow outs and unexpected costs.... We will also pay the deposit for the 50 panel solar system this week and get the application in for the government rebate, once that is done, it should be only about 7 weeks before we have power to the house!
cya
Thursday, August 23, 2007
Semi-sustainable caravan life.
As we have will not have our solar power for another 2 months ( at least) and the caravan can only be powered by 240 volt cable, we were faced with the prospect of having to run a generator every night for a couple of months to power the water pump (shower/toilet/sink), the laptop for internet access, charge the mobile phones etc etc. Even if I re-wired the van and set up a battery, the battery would have had to be charged for a few hours each day to use each night.... not only is the generator noisy, it seemed like unnecessary carbon emissions.
So, I've done what I'd always wanted to do for work... carry my own power source for Xrays, Ultrasounds etc just in case the power was unavailable at the horse. We've been meaning to do it for years, but this seemed the right excuse... I've installed a large 90amp 12V second battery into the work car with a 1000W inverter which will convert the 12V into 240V. The batteries will be wired so that as I drive around all day for work, both batteries will get charged. When I get home, I can plug the caravan directly up to the inverter in the back of the car. Although the battery won't stay charged for very long if a lot of appliances are used, if we are conservative, it should last each night and be useful for the laptop, phones, light and water. This way we will only use the generator occasionally for tools, vacuum cleaner etc. The first battery in the car will be protected so that it won't be used for the inverter and eliminate the risk of having a car with a flat battery in the morning! This option definitely eases my conscience when it comes to the amount of driving I do each day (~250km).
The Protector 1000W inverter cost about $420 and the lead acid battery was $187 (a gel battery or a fully sealed one is around $330). Add another couple hundred for the battery case and wiring by the autoelectrician. Will report on how it works next time!